Major Project Summary  
 
Intercontinental Airport Houston, Continental Airlines Terminal E
DESCRIPTION:  Electrical installation and distribution of material and equipment.
 
Southwestern Bell, Richardson, Texas Project
DESCRIPTION:  Switchgear package and lighting package including circuit breaker products and materials.
 
DFW Airport – Terminal Project
DESCRIPTION:  Terminal D expansion Storm Drainage Line B1 AR Phase III.  Provided construction materials.
 
DFW Airport – Terminal D – Parking Garage
DESCRIPTION:  Provided concrete staining, paint surface and a high build glazed coating for Terminal D Parking Garage.
 
City of Houston – Wastewater Treatment Plant
DESCRIPTION:  Provided steel, lumber, paint surface and a high build glazed coating for Wastewater facility.
 
 
 
 
 
 
 
 
 
 
2626 South Loop West, Suite 150                                      
Houston, TX 77054  
(713) 665-4049 Phone
(713) 665-1788 Fax                                            
 
TCB Services
      supply X demand